Pattaya Daily News

07 December 2016 :: 04:12:36 am 117420

Huge Traffic Sign Installed At Central Pattaya Tunnel

Official Central Pattaya tunnel for a short time to install big traffic sign.
Advertise Here

PATTAYA – December 6,2016 [PattayaDailyNews]; Journalist was told that Central Pattaya tunnel is temporarily open in the east side after the official installed the big traffic sign.

 

03 04

 

However, the tunnel is not completely finished, the officers are installing the traffic signs in the tunnel and cleaning inside. In addition, some people driving pass this road were not so sure that they can use this tunnel so they asked the officers.

 

Mr Thitiwat Anurujtikul, project engineer, revealed that the officers only open the tunnel to install the traffic sign and they would close the tunnel after the traffic signs were installed. They spent around 5 hours to install the sign. Meanwhile, the officers are finishing air system and road surface. It’s expected that the tunnel will be available in April 2017.

 

05 06

 

Central Pattaya tunnel project has been allocated 850 million baht by Office of rural road and the operator would hand over the project to Pattaya official in February 2017. In addition, the tunnel has CCTV, drainage, air system and fire equipment.

Reporter : Teerarak   Photo : Teerarak   Category : Community News

Comments in News


    
CAPTCHA Image
*

The messages you read here are opinions from the public and posted into the Forum automatically. The systems owner is not responsible for any content in the Forum or any comments posted. There is no proof that the contents posted are genuine or not, even if the name of the poster is real, th erefore, please use common sense when reading the Forum. If there are topics which are against the law or immoral, please contact webmaster@pattayadailynews.com